Date of sample points defaults to date of sample run
planned
J
Jemma Gooley
I thought that if we chose the date of the sample run as the sample date, that would filter through to each individual sample so we don’t have to change each one, but it looks like each sample date defaults to the creation date. Is this able to be fixed so that the default is the date of the sample run and not the date it was created. Editing maybe still required but not as much.
B
Bhagya de Silva
planned